In September 2023, the Kran team was requested to perform a pallet lifting operation at a residential project in Techirghiol, Constanța. The main objective of the operation was to lift and transport 12 BCA pallets to the 4th floor of a building under construction.
Date: September 2023
Duration: Less than a day
Location: Techirghiol, Constanța
Crane Operator: Florin C.
Equipment Used: Scania R164G 8x4 with FASSI F900XP Crane (20 tons)
Operation Details
- Planning: The Kran team analyzed the project requirements and established an efficient plan for lifting and transporting the BCA pallets.
- Equipment: We used a truck-mounted crane, the Scania R164G 8x4 model equipped with a FASSI F900XP crane, ideal for handling heavy loads.
- Execution: Under the coordination of crane operator Florin C., the operation was carried out quickly and safely, successfully lifting all 12 pallets to the 4th floor in less than an hour.
Impact and Results
Thanks to the professionalism and top-notch equipment used by our team, the project was completed in record time, ensuring the continuity of construction work without delays. Our clients were pleased with the promptness and efficiency with which we managed the operation, guaranteeing a successful collaboration.