The Kran team was hired to unload and position an aggregate formed from several components of machinery within an industrial hall. Each component of the aggregate had dimensions of 1.4 m in width and 1.2 m in height, with a weight of approximately 3.5 tons. The operation required careful handling to assemble the components into their final positions inside the hall.
Services provided:
- Mobilization of a forklift with adequate capacity to handle the specified weights.
- Unloading and positioning of the machinery components.
- Coordination with the supplier to ensure an efficient and safe operation.
This operation demonstrated the Kran team's ability to manage complex logistics and to ensure precise placement of heavy equipment in limited space conditions.