+40 757 016 913 contact@kran.ro

High-Precision Port Handling: 7-Ton Operations at Port Constanța (Dana 34)

Port Dana 34, Constanța

0 Used machineries

Kran recently completed a complex logistics operation at Port Constanța’s Dana 34. By leveraging high-capacity handling equipment, we delivered fast, safe cargo solutions while navigating the intensive, high-pressure workflows of a major industrial terminal.

Equipment Used: Caterpillar DP70

For this intervention, we mobilized a Caterpillar DP70 diesel forklift, recognized for reliable performance in continuous-duty operations.

  • Lifting capacity: 7 tons
  • Key advantages: Maximum stability under load, precise positioning control, and strong performance in open port environments.

Scope of Work

The operation involved an integrated on-site logistics process:

  • Controlled lifting: Handling heavy loads with close attention to load balance and center of gravity.
  • Maneuvering and transport: Efficient movement within the quay area, alongside other equipment and active cargo flows.
  • Accurate positioning: Precise placement of materials according to the storage/loading logistics plan.

Safety and Professional Execution

All works were performed under strict safety standards:

  • Certified operators: Trained personnel experienced in port operating conditions.
  • Compliance: Full adherence to Port Constanța safety regulations.
  • Efficiency: Maintaining an uninterrupted workflow and minimizing downtime within the terminal.

Project Technical Sheet 

  • Location: Port Dana 34, Constanța
  • Equipment type: 7T diesel forklift (Caterpillar)
  • Work environment: Active industrial terminal
  • Operation type: Cargo handling / short-term logistics support

Toți operatorii implicați în proiect
Toate utilajele folosite în project