Introduction
Using our "Terex Demag AC100-5 100 Tons" crane, we recently participated in the work of loading and unloading a boat in our city.
Operation Details
- Equipment Used: Terex Demag AC100-5 100 tone
- Location: Str. Calarasi, Constanta
- Task Details: Loading and unloading a 10-ton boat
- Duration: 1 hour as estimated
Operational Process
Once the client reached out, we initiated the process by confirming their requirements and finalizing the operational details. We loaded the boat from Constanta and unloaded it at Techirghiol at the spa sanatorium on the shores of the lake. With every maneuver, we ensure our clients' safe and service.
Client Collaboration
The partnership with our client demonstrated the commitment to build strong relationships between the parties. We believe that understanding the specific needs and offering personalized solutions can offer you the most efficient and safe work possible. We are grateful for the trust offered to all the projects carried out and the organization of tasks ensured by efficient communication for a high quality yield.
Acknowledgments
We are grateful to our client for choosing Kran for this project. We are committed to providing efficient services and building strong long-term partnerships. We hope to work together again in the future to achieve our goals. We are here to ensure that every job is completed successfully by providing safe and efficient equipment.
Thank you for choosing KRAN!