Description:
Kran provided two mobile cranes to support TransTruck VLD for a half-day heavy lifting operation at Port Constanța, Dana 89–90 (Steel Cems yard). The job involved the coordinated unloading of excavator components and a tubing machine weighing approximately 60 tonnes from a truck, followed by positioning and mounting of the excavator.

Equipment Used:

  • Terex Demag AC100-5 (100 t) – Main lifting crane
  • Faun ATF 45-3 (45 t) – Tail/assisting crane

Location:
Port Constanța – Dana 89–90, in the yard of Steel Cems SRL

Duration:
Half day

Scope of Work:

  • Dual crane lift for safe unloading of a 60 t tubing machine
  • Precise maneuvering and placement in confined yard conditions
  • Follow-up assembly of excavator components on site

Technical Notes

Lifting Configuration:

  • Main Crane: Terex Demag AC100-5 (100 t capacity) – primary lifting and slewing
  • Assist Crane: Faun ATF 45-3 (45 t capacity) – tailing and support for controlled positioning

Rigging: Dual-crane tandem lift with spreader bars and heavy-duty chain slings

Ground Conditions: Compacted yard surface with wet patches; steel mats used for stability where necessary

Safety Measures:

  • Full lift plan and tandem lifting procedure prepared and approved prior to operation
  • Certified operators and riggers on site
  • Exclusion zones established and supervised during lifting

Special Considerations:

  • Tight working area inside Steel Cems yard required precise coordination between cranes
  • Tandem lift ensured balanced load distribution and safe maneuvering of the 60 t tubing machine