Introduction
We are tasked to install a metal beam measuring 12 meters in length and weighing 2.4 tons. The installation requires a height of 10 meters, with the machinery operating from a distance of 24 meters from the load. Equipped with cutting-edge technology such as Anti-lock Braking System (ABS), a cruise control, and an automated transmission for smooth operations. The crane has a lifting capacity of 50 tons that enables the movement of heavier elements much faster than the other equipment.This made the operation special in terms of lifting capacity and ease of handling.
Technical Details of the Operation
- Type of equipment used: Terex Demag AC50-3 50 tons
- Location: Mangalia, Constanța
- Duration: One day as estimated
- Task details: Installation of metal structures to form a stage
- Operator: Cacenco Florin
Operational Process
Operations were carried out considering the distance of the equipment from the load that needed to be handled safely and with maximum precision to complete the project. A boom length of 40 meters offers considerable reach and flexibility for various lifting operations extending up to 58 meters. This allows for better load handling and the ability to handle challenging tasks.
Coordination with the Client
From the start our client TENSILE FABRIC STORE S.R.L, shared the details of the upcoming event. This made organization crucial for both us as the service provider and for the client. Our goal was to address the challenges and situations, leading to the successful achievement of the initial goal.
Acknowledgement
We were pleased to be part of the process for the event and to know that our proposed objective was successfully achieved. With each project we complete, we aim to satisfy more clients and continue our evolution through passion, hard work, and teamwork.