In April, our equipment rental services were requested by a local client for the installation of two Mol Petrol Station totems in Murfatlar, Constanta.
The client had to lift and install two petrol station totems of 1t each.
After the expertise of our team and the client, a mobile crane and a truck-mounted boom lift were needed in order to complete this task.
The mobile crane was used to lift the two support poles of 1t each while the truck-mounted boom lift was used to lift the team responsible for the installation.
Each support pole was made of three pieces that had to be mounted together, forming one unit of 21m in height.
First, the two poles were lifted and secured in place, and then the two sign boards of 500kg each had to be installed on top of them.
The two pieces of equipment worked in tandem to ensure the proper and safe installation.
Our operators made sure the equipment was secured properly and took all the safety measures so the project would be done in the safest environment.
The installation project took about half a day to complete as everything had to be done properly.
Our operators collaborated very well with our client’s team, completing the project within the set timeframe.
Our client was very pleased with the final results and we hope to do business again with them in the future.
This task was a great opportunity to show again the reliability and professionalism of our team, equipment and services.