Introduction
To ensure the needed comfort of the customers at the Techirghiol spa resort. We were tasked with installing a 350 kg professional air conditioning unit, to be placed at a height of 25 meters and a distance of 15 meters from the load.
Technical Details of the Operation
- Type of equipment used: Terex Demag AC50-3 50 tons
- Location: Techirghiol, Constanța
- Duration: 1 hour of work as estimated
- Load details: Installation of an air conditioning unit on the roof of the Techirghiol Spa Resort
- Operator: Chirita Bogdan
Operational Process
Although the entire operational process was short, the access to the building was challenging and the handling height was quite high, which led to a new skill and gaining more knowledge for our team. The crane was set up on an unpaved area, surrounded by trees that obstructed visibility. However, the operator demonstrated both consistency and effectiveness in maneuvering the equipment, and the crane provided both mobility and safety in lifting the load.
Client Collaboration
We were pleasantly surprised that the client, MULTIPLEX CLIMA EXPERT S.R.L, provided excellent communication regarding all necessary details, confirming once again that this is the right way to successfully achieve each proposed objective.
Acknowledgement
We continue to support every client in need and wish to evolve together by participating in as many projects of this scale as possible. In doing so, we support both our cultural events and the contemporary evolution of everything modern and beautiful according to our vision as a company.