We successfully installed sewer manholes on the beach at Mamaia Nord, a complex project that involved digging large holes and installing concrete water manholes.
In the first stage, an excavator was used to dig the large holes, preparing the sandy areas for installation. After this preparation, the concrete water manholes were lifted and transported using the Terex Demag AC100-5 crane, demonstrating our capability to handle heavy equipment with precision.
Finally, the manholes were lowered and positioned accurately into the prepared holes, ensuring the stability and proper alignment necessary for the efficient operation of the sewer system. This approach guaranteed a professional execution in line with the project's quality standards.