Introduction
Last week, Kran participated in the project on Celulozei Street in Constanța. It was necessary to unload a piece of equipment and position it inside a building weighing 3 tons at a height of 14 meters.
Details of the Operation
- Equipment used: Yale GDP 50 MF forklift with a 5-ton lifting capacity & Scania R164G 8x4 truck equipped with a FASSI F900XP 20-ton crane.
- Location: Constanța, Celulozei Street
- Duration: 1 workday as expected
- Task details: Unload a piece of equipment weighing 3 tons and place it inside a building at a height of 14 meters.
- Operators: Marin Valentin and Petrache Dorin-Andrei
Operational Process
To manage the task correctly, we had to rent a 5-ton capacity forklift to unload the equipment from the container. Then a truck with a crane was needed to lift the equipment to a height of 14 meters and position it inside the building. The task was completed with the equipment being handled with great care.
Client Collaboration
Our collaboration with the client "Rodata S.R.L" was certainly a beneficial experience for both our growth and work methods, as well as the client's satisfaction upon completing the task. We are pleasantly surprised and grateful to thank our client and look forward to continuing to provide solutions. This task was completed using a truck crane which has a long and efficient arm reaching up to 34 meters. Both were robust and flexible which allowed us to install the equipment inside the building without the need for additional machinery.
Acknowledgment
We continue to accept new challenges every day, and with each task, we come closer to the success of everyone involved. Our priority is to provide efficient, versatile, and practical equipment to complete each task. We believe that every client contributes to the development of our team. The level of preparedness, management, organization, and coordination ensures the trust we are given and fosters continuous development.
Thank you for choosing KRAN!