KranKran
Home
Services
EquipmentProjectsContact

Kran

Str. Emil Bota nr. 16A
Agigea, Constanța 907015
Romania

Services

  • Cranes
  • Forklifts
  • Aerial Platforms

Links

  • Equipment
  • Projects
  • Contact

Contact

  • +40 757 016 913Phone
  • contact@kran.roEmail
  • WhatsApp
Str. Emil Bota nr. 16A, Agigea, Constanța 907015
PrivacyPrivacy policyCookiesCookie policyTermsTerms and conditions

© 2026 Kran. All rights reserved.

We use cookies to measure site performance and advertising campaigns. You can choose which categories to accept. Cookie policy

/

Wind Turbine Generator Handling with Heavy-Duty Forklift at Vestas Facility, Constanța

Portfolio/Forklifts
LOCATIONConstanța
DURATIONless than a day
EQUIPMENTSvetruck 28120-46 28 Tones
LOCATIONConstanța
DURATIONless than a day
EQUIPMENTSvetruck 28120-46 28 Tones

Project details

The operation involved unloading and handling wind turbine generators (Winergy type) arriving on flatbed trailers at a wind energy operator's facility in the Constanța area. Each unit weighed approximately 19 tonnes, requiring a high-capacity counterbalance forklift.

A Svetruck 28120-46 engine-powered forklift with a 28-tonne lifting capacity was deployed. The scope included unloading the generators from the trailers and transporting them to their storage position inside the warehouse.

Direct forklift access to the trailer eliminated the need for intermediate transshipment. The units were set down on heavy timber pallets and secured with straps per the client's instructions.