KranKran
Home
Services
EquipmentProjectsContact

Kran

Str. Emil Bota nr. 16A
Agigea, Constanța 907015
Romania

Services

  • Cranes
  • Forklifts
  • Aerial Platforms

Links

  • Equipment
  • Projects
  • Contact

Contact

  • +40 757 016 913Phone
  • contact@kran.roEmail
  • WhatsApp
Str. Emil Bota nr. 16A, Agigea, Constanța 907015
PrivacyPrivacy policyCookiesCookie policyTermsTerms and conditions

© 2026 Kran. All rights reserved.

We use cookies to measure site performance and advertising campaigns. Cookie policy

/
Extensive Project at Petromidia Refinery

Extensive Project at Petromidia Refinery

Portfolio/Forklifts
LOCATIONNavodari, Romania
EQUIPMENTStill R60-20 2 Tons
EQUIPMENTIveco EuroTech Bonfiglioli P22500 XL 6 tonnes
EQUIPMENTJCB 530-120
EQUIPMENTVolvo FH16 750 Globetrotter 6x4
EQUIPMENTManitou M26-2 2.5t
EQUIPMENTScania R164G 8x4 FASSI F900XP 20 tonnes
EQUIPMENTFaun ATF 500XL 45-3 45 tonnes
EQUIPMENTTerex Demag AC50-3 50 tonnes
EQUIPMENTTerex Demag AC100-5 100 tonnes
LOCATIONNavodari, Romania
EQUIPMENTStill R60-20 2 Tons
EQUIPMENTIveco EuroTech Bonfiglioli P22500 XL 6 tonnes
EQUIPMENTJCB 530-120
EQUIPMENTVolvo FH16 750 Globetrotter 6x4
EQUIPMENTManitou M26-2 2.5t
EQUIPMENTScania R164G 8x4 FASSI F900XP 20 tonnes
EQUIPMENTFaun ATF 500XL 45-3 45 tonnes
EQUIPMENTTerex Demag AC50-3 50 tonnes
EQUIPMENTTerex Demag AC100-5 100 tonnes

Project details

Project Overview

Client: Petromidia Refinery
Duration: 2 months (Started last January 2024)
Location: Navodari, Romania

Project Description and Requirements

Petromidia Refinery, located in Navodari, Romania, is one of the largest and most complex refineries in Eastern Europe. It plays a crucial role in the region’s energy infrastructure, undergoing regular inspections and overhauls to maintain its high standards of operational safety and efficiency. The project involved a thorough revision of the entire refinery, mandated by law to occur every 4-5 years. Kran’s role was to supply the necessary heavy machinery and equipment to ensure a seamless and efficient inspection process.

Used Equipments

After a detailed assessment of the project requirements, we provided the following equipment:

  1. 1 40-ton Crane, 1 50-ton Crane, and 1 100-ton Crane
  2. Two Trucks with 20-ton Cranes
  3. One Tractor with a 12-meter Flat Trailer
  4. Two Manitou 5-ton Telehandlers
  5. Additional Equipment as needed

Project Timeline

The project was meticulously planned to ensure timely delivery and utilization of equipment:

  • Cranes were scheduled from mid-February.
  • Trucks with 5-ton cranes were also required from mid-February.
  • Standard cranes were needed from early February(crane rental).

Coordination and Execution

Effective coordination was key to the project’s success. We maintained continuous communication with Petromidia Refinery to ensure all equipment was delivered on schedule and met the project’s specific requirements. Contracts and official requests were managed promptly to facilitate a smooth workflow (crane rental).

Conclusion

The Petromidia Refinery overhaul project demonstrates our experience in providing crane rental services for large-scale industrial tasks. Through detailed planning, clear communication, and a focus on meeting the client’s specific needs, we were able to facilitate the project’s smooth execution.

Have a project with special requirements?

We help you choose the right equipment and approach.

4.9
101 Google reviews
Request similar project

Equipment Used

Still R60-20 2 Tons

Still R60-20 2 Tons

Iveco EuroTech Bonfiglioli P22500 XL 6 tonnes

Iveco EuroTech Bonfiglioli P22500 XL 6 tonnes

JCB 530-120

JCB 530-120

Volvo FH16 750 Globetrotter 6x4

Volvo FH16 750 Globetrotter 6x4

Manitou M26-2 2.5t

Manitou M26-2 2.5t

Scania R164G 8x4 FASSI F900XP 20 tonnes

Scania R164G 8x4 FASSI F900XP 20 tonnes

Faun ATF 500XL 45-3 45 tonnes

Faun ATF 500XL 45-3 45 tonnes

Terex Demag AC50-3 50 tonnes

Terex Demag AC50-3 50 tonnes

Terex Demag AC100-5 100 tonnes

Terex Demag AC100-5 100 tonnes