KranKran
Home
Services
EquipmentProjectsContact

Kran

Str. Emil Bota nr. 16A
Agigea, Constanța 907015
Romania

Services

  • Cranes
  • Forklifts
  • Aerial Platforms

Links

  • Equipment
  • Projects
  • Contact

Contact

  • +40 757 016 913Phone
  • contact@kran.roEmail
  • WhatsApp
Str. Emil Bota nr. 16A, Agigea, Constanța 907015
PrivacyPrivacy policyCookiesCookie policyTermsTerms and conditions

© 2026 Kran. All rights reserved.

We use cookies to measure site performance and advertising campaigns. Cookie policy

/
Lifting Stainless Steel Cylinders in Constanta

Lifting Stainless Steel Cylinders in Constanta

Portfolio/Mobile Cranes
LOCATIONConstanta
DURATIONless than a day
EQUIPMENTScania 124G 8x4 FASSI F660XP 20 tonnes
EQUIPMENTScania R164G 8x4 FASSI F900XP 20 tonnes
LOCATIONConstanta
DURATIONless than a day
EQUIPMENTScania 124G 8x4 FASSI F660XP 20 tonnes
EQUIPMENTScania R164G 8x4 FASSI F900XP 20 tonnes

Project details

Introduction

For this project in Constanta, our team provided two crane trucks, Scania 124G 8x4 FASSI F660XP (20 tons) and Scania R164G 8x4 FASSI F900XP (20 tons), to lift and relocate large stainless steel cylinders. The operation required careful handling to ensure safe lifting and transport, including the movement of additional tanks.

Technical Details of the Operation

  • Equipment used: Scania 124G 8x4 FASSI F660XP 20 tons and Scania R164G 8x4 FASSI F900XP 20 tons
  • Location: Constanta
  • Duration: 6 hours, according to the work estimate
  • Task: Lifting a long cylinder and repositioning it horizontally

Operational Process

We used the Scania 124G 8x4 FASSI F660XP to lift and reposition the stainless steel cylinders. Based on the client requirements, the cylinders had to be handled horizontally. Additional tanks were moved using both crane trucks, including the Scania R164G 8x4 FASSI F900XP, to keep the operation safe for the surrounding infrastructure.

After the relocation, we completed a final safety check to confirm that the operation met all safety standards and that the infrastructure was not affected.

Client Coordination

Clear communication with the client was essential. Their technical details helped us plan every step, and we used additional transport rollers to support easier movement of the tanks. Together, we completed the project smoothly and without incidents.

Thank You

We thank our client for choosing KRAN for this operation and we look forward to future collaborations. Our team remains committed to supporting your projects with reliable equipment and experienced operators.

Thank you for choosing KRAN!

Have a project with special requirements?

We help you choose the right equipment and approach.

4.9
101 Google reviews
Request similar project

Equipment Used

Scania 124G 8x4 FASSI F660XP 20 tonnes

Scania 124G 8x4 FASSI F660XP 20 tonnes

Scania R164G 8x4 FASSI F900XP 20 tonnes

Scania R164G 8x4 FASSI F900XP 20 tonnes